久久婷婷六月,妺妺窝人体色www在线直播,高清久久精品亚洲日韩Av,99精品免费视频,无人视频在线观看免费播放影院,亚洲尤物av一区,国产成人精品亚洲午夜,国产成人亚洲欧美日韩

      佛山市宏宸陶瓷有限公司

        Foshan Hongchen Ceramics Co. LTD

      National Service Hotline:

      0757-82723870  

      Make bricks with care and focus on engineering tiles

      With craftsmanship, remain craftsmen, craftsmen
      FAQ
      What preliminary work do we usually need to do before laying bricks?
      2019/5/1 0:00:00

      In daily life, if we want ceramic tiles to last for a long time, not only do we need to maintain them after laying them, but also the preparation work before laying them is extremely important. Some ceramic tiles laid on household walls will fall off to some extent after 5-6 years of decoration and use. This is because the preparation work before laying them is not done enough, which causes this phenomenon to occur. Here, we teach you the methods to prevent falling off when laying tiles.


      1、 Ceramic tiles should fully absorb water


      Floor tiles or ceramic tiles are all materials that need to be soaked in water. It is necessary to ensure that they soak in water for sufficient time to keep the moisture of the tiles in a saturated state. This way, the tiles will not absorb water from the cement due to insufficient moisture and excessive dryness during laying. If this situation occurs, it will cause poor bonding between the tiles and the cement, and even hollowing or even falling off;


      2、 Before laying, thoroughly clean the wall surface


      If there are cracks or uneven areas on the wall, it is necessary to first fill them with sealant to maintain the flatness of the wall. If there are objects such as lime paste, they should also be cleaned before laying. A flat and clean wall is more conducive to the bonding between tiles and the wall;


      3、 The wall should be soaked and moist


      Not only do tiles need to be soaked in water to keep them moist, but before tiling, the walls should also be fully watered to maintain a moist state. This way, the moisture in the mortar will not be absorbed by the dry wall and affect the bonding degree. Otherwise, the effect of cement adhesive will not be obvious, which will affect the bonding degree and cause potential risks of tile detachment in the future.


      暫無內容

      Contact hotline

      tel:18064692610

      wc:18064692610

      Email:2161499560@qq.com



      佛山市宏宸陶瓷有限公司

      Foshan Hongchen Ceramics Co. LTD

      What preliminary work do we usually need to do before laying bricks?

      In daily life, if we want ceramic tiles to last for a long time, not only do we need to maintain them after laying them, but also the preparation work before laying them is extremely important. Some ceramic tiles laid on household walls will fall off to some extent after 5-6 years of decoration and use. This is because the preparation work before laying them is not done enough, which causes this phenomenon to occur. Here, we teach you the methods to prevent falling off when laying tiles.


      1、 Ceramic tiles should fully absorb water


      Floor tiles or ceramic tiles are all materials that need to be soaked in water. It is necessary to ensure that they soak in water for sufficient time to keep the moisture of the tiles in a saturated state. This way, the tiles will not absorb water from the cement due to insufficient moisture and excessive dryness during laying. If this situation occurs, it will cause poor bonding between the tiles and the cement, and even hollowing or even falling off;


      2、 Before laying, thoroughly clean the wall surface


      If there are cracks or uneven areas on the wall, it is necessary to first fill them with sealant to maintain the flatness of the wall. If there are objects such as lime paste, they should also be cleaned before laying. A flat and clean wall is more conducive to the bonding between tiles and the wall;


      3、 The wall should be soaked and moist


      Not only do tiles need to be soaked in water to keep them moist, but before tiling, the walls should also be fully watered to maintain a moist state. This way, the moisture in the mortar will not be absorbed by the dry wall and affect the bonding degree. Otherwise, the effect of cement adhesive will not be obvious, which will affect the bonding degree and cause potential risks of tile detachment in the future.


         
       
      X
       
         
      主站蜘蛛池模板: 国产成人精品男人的天堂网站| 久久麻豆精亚洲av品国产精品| 人妻无码ΑV中文字幕久久琪琪布 国产日产久久福利精品一区 | 日本精品久久性大片日本| 国产精品美女久久久浪潮av| 色婷婷激情在线一区二区三区| 视频网站在线观看不卡| 绥阳县| 亚洲一区二区婷婷久久| 麻豆免费观看视频在线观看| 亚洲av综合色区久久精品天堂| 梁山县| 青青草亚洲在线一区观看| 黑丝美女喷水在线观看| 亚洲av乱码专区国产乱码| 国产av普通话对白国语| 东兴市| 亚洲精品天堂在线观看| 欧美激情国产一区在线不卡| 龙井市| 国产激情一区二区三区成人免费| 扶绥县| 乐平市| 烟台市| 巴林左旗| 城市| 国产韩国精品一区二区三区| 久久亚洲精品成人av| 尉氏县| 镇平县| 日本少妇精品一区二区| 中出高潮了中文字幕| 久久国产乱子精品免费女| 国产一区二区亚洲一区二区三区| 阿克| 久久久www成人免费无遮挡大片| 日韩在线手机专区av| 蜜桃视频中文字幕一区二区三区 | 久久精品国产一区二区涩涩| 国产目拍亚洲精品区一区| 中文字幕人妻少妇第一页 |