      What preliminary work do we usually need to do before laying bricks?
      2019/5/1 0:00:00

      In daily life, if we want ceramic tiles to last for a long time, not only do we need to maintain them after laying them, but also the preparation work before laying them is extremely important. Some ceramic tiles laid on household walls will fall off to some extent after 5-6 years of decoration and use. This is because the preparation work before laying them is not done enough, which causes this phenomenon to occur. Here, we teach you the methods to prevent falling off when laying tiles.


      1、 Ceramic tiles should fully absorb water


      Floor tiles or ceramic tiles are all materials that need to be soaked in water. It is necessary to ensure that they soak in water for sufficient time to keep the moisture of the tiles in a saturated state. This way, the tiles will not absorb water from the cement due to insufficient moisture and excessive dryness during laying. If this situation occurs, it will cause poor bonding between the tiles and the cement, and even hollowing or even falling off;


      2、 Before laying, thoroughly clean the wall surface


      If there are cracks or uneven areas on the wall, it is necessary to first fill them with sealant to maintain the flatness of the wall. If there are objects such as lime paste, they should also be cleaned before laying. A flat and clean wall is more conducive to the bonding between tiles and the wall;


      3、 The wall should be soaked and moist


      Not only do tiles need to be soaked in water to keep them moist, but before tiling, the walls should also be fully watered to maintain a moist state. This way, the moisture in the mortar will not be absorbed by the dry wall and affect the bonding degree. Otherwise, the effect of cement adhesive will not be obvious, which will affect the bonding degree and cause potential risks of tile detachment in the future.


      暫無(wú)內(nèi)容

      Contact hotline

      tel:18064692610

      wc:18064692610

      Email:2161499560@qq.com



      佛山市宏宸陶瓷有限公司

      Foshan Hongchen Ceramics Co. LTD

      What preliminary work do we usually need to do before laying bricks?

      In daily life, if we want ceramic tiles to last for a long time, not only do we need to maintain them after laying them, but also the preparation work before laying them is extremely important. Some ceramic tiles laid on household walls will fall off to some extent after 5-6 years of decoration and use. This is because the preparation work before laying them is not done enough, which causes this phenomenon to occur. Here, we teach you the methods to prevent falling off when laying tiles.


      1、 Ceramic tiles should fully absorb water


      Floor tiles or ceramic tiles are all materials that need to be soaked in water. It is necessary to ensure that they soak in water for sufficient time to keep the moisture of the tiles in a saturated state. This way, the tiles will not absorb water from the cement due to insufficient moisture and excessive dryness during laying. If this situation occurs, it will cause poor bonding between the tiles and the cement, and even hollowing or even falling off;


      2、 Before laying, thoroughly clean the wall surface


      If there are cracks or uneven areas on the wall, it is necessary to first fill them with sealant to maintain the flatness of the wall. If there are objects such as lime paste, they should also be cleaned before laying. A flat and clean wall is more conducive to the bonding between tiles and the wall;


      3、 The wall should be soaked and moist


      Not only do tiles need to be soaked in water to keep them moist, but before tiling, the walls should also be fully watered to maintain a moist state. This way, the moisture in the mortar will not be absorbed by the dry wall and affect the bonding degree. Otherwise, the effect of cement adhesive will not be obvious, which will affect the bonding degree and cause potential risks of tile detachment in the future.


         
       
      X
       
         
      主站蜘蛛池模板: 国产91久久精品一区二区| 塔城市| 国产熟女自拍视频网站| 1234.com麻豆性爰爱影| 莫力| 娇妻粗大高潮白浆| 国产精品国产三级国av在线观看| 国产综合色婷婷精品久久| 揄拍成人国产精品视频肥熟女| 台湾省| 中文字幕乱码第一二三区| 免费人成在线播放首页| 国产在视频线精品视频二代| 国产成本人视频在线观看 | 淫妇日韩中文字幕在线| 久久久精品国产视频在线| 亚洲一区二区三区无吗| 精品黄色av一区二区三区| 佛冈县| 安龙县| 芜湖县| 泸定县| 会昌县| 久久精品天堂一区二区三区| 杨浦区| 国产啪精品视频网站免| 浠水县| 涞源县| AV熟妇导航网| 国产毛片一区二区日韩| 97久久成人国产精品免费| 亚洲中文字幕在线精品一区| 亚洲人成网站18男男| 水蜜桃视频在线观看免费18| 超碰在线公开中文字幕| 久久99久久99精品免视看国产成人| 久久亚洲aⅴ精品网站婷婷| 久久久精品中文字幕综合| 亚洲天堂免费一二三四区| 国产大陆av一区二区三区| 国产精品激情综合久久|